No guessing what happens next.

Here is exactly how a project goes, from the first phone call to the city signing off. Same path for one beam or a whole 2nd story addition.

Temporary adjustable shoring posts holding the ceilingShored before anything comes out

The five steps

From consultation to city inspection.

  1. 1

    Phone consultation

    We learn your goals and the problem, give you an approximate budget and timeline, and decide together if a site visit is next.

    Free, about 15 minutes
  2. 2

    On-site evaluation

    The owner, construction manager and engineer inspect, answer questions and plan the structural part with you. Costs and next steps before we leave.

    Often within the week
  3. 3

    Scan and document

    We scan every home we visit, so engineering, drafting and planning happen without return trips.

    During the visit
  4. 4

    Quote

    Scope, engineering and construction costs, and duration, by email. You can choose engineering and drafting only.

    About a day later
  5. 5

    Engineering, permit, build

    Permit-ready design, permit pulled, crew on site until it is finished, inspection signed off.

    5 to 10 work days, then 1 to 3 days on site

On site

What build days look like

  • Early starts, full days. Crews typically arrive around 7:30/8:00am and work into the afternoon.
  • One job at a time. Once we start yours, we don't leave for another site until it's done.
  • Protection first. Floors covered, surfaces protected, dust walls with filters and negative pressure.
  • Updates as we go. The project lead tells you what is happening and what is next.
  • Clean every day. Debris gets hauled out and placed in designated area or hauled away.

Paperwork

What you get

  • A written quote with scope, engineering as needed, construction cost and duration.
  • Permit-ready engineering in a private folder you keep.
  • The permit pulled with your city.
  • Photos and documentation of the structural work before it is covered.
  • A passed inspection scheduled and met by us.

Where we stop

We do the hard part. Then we hand it back.

Every job has a clear line between our work and yours. You know before you pay anything where we start and where we stop.

We doYou or your trades do
Before
Plan, engineer, permit, tell you what to clearClear the area, remove finishes if we suggest it
During
Shoring, demo, structure, cleanupNothing. Live your life.
After
Inspection and documentationDrywall, electrical, paint, finishes

Next step

Tell us about your project

Send a few photos and a sentence about the problem. We aim to reply same day (often within minutes) or next if we are slammed - with the right next step.

  • Free 15-minute call for handyman, construction and design projects
  • Engineering and construction under one roof
  • MN licensed contractor, BC706454